List of Flash News about Hut 8
| Time | Details |
|---|---|
|
2026-10-15 17:48 UTC |
Hut 8: Moves $146M BTC as Treasury Data Stays Outdated
OnchainLens reports Hut 8 shifted 1,783 BTC valued at $146.10M to a new wallet, with 1,147.866 BTC flowing onward to exchanges and OTC desks while onchain holdings sit at 4,894 BTC versus the stale 10,278 BTC figure last updated in November 2025. |
|
2026-10-15 17:08 UTC |
Hut 8: Deposits 1,589 BTC to Exchanges
Lookonchain reports that Bitcoin treasury company Hut 8 deposited 1,589 BTC worth $130 million into multiple exchanges over the past two days from its 10,278 BTC holdings valued at $845.6 million. |
|
2026-08-11 19:07 UTC |
MetaPlanet: Transfers 1473 BTC Worth $93.82M
MetaPlanet moved 1473 BTC ($93.82M) and Hut 8 sent 493 BTC ($31.36M) while BTC trades at $63831.45 with bearish EMA structure. |
|
2026-05-18 06:37 UTC |
Third Point: Dan Loeb Adds Hut 8 AI Stake
Third Point takes fresh stakes in Hut 8 and chip firms as Dan Loeb ramps AI exposure amid AI industry impact on Bitcoin miners. |
|
2026-05-06 08:29 UTC |
Hut 8: Secures Second AI Campus Lease
Hut 8 lands second hyperscale AI campus lease in Nueces County, pivoting from Bitcoin mining amid BTC price surges to $81K levels. |
|
2026-05-06 06:29 UTC |
Hut 8: Shares Hit All-Time High on $9.8B AI Lease
Hut 8 shares surge to record highs after signing $9.8 billion AI data center lease, boosting Bitcoin mining stocks amid crypto market rally. |
|
2025-12-17 08:35 UTC |
Hut 8 ($HUT) Announces $7 Billion Anthropic Data Center Deal: Up to 2,295 MW Capacity, Potential Value Reaches $17.7 Billion
According to @KobeissiLetter, Hut 8 ($HUT) announced a $7 billion data center development collaboration with Anthropic, targeting up to 2,295 MW of utility capacity (source: @KobeissiLetter). The deal could be valued up to $17.7 billion, as reported by @KobeissiLetter (source: @KobeissiLetter). |
|
2025-12-17 04:45 UTC |
Hut 8 Partners With Google on $7B Data Center Lease: Trading Watch for BTC Miner Exposure and AI Infrastructure
According to WatcherGuru, Bitcoin miner Hut 8 has partnered with Google to back a $7 billion data center lease, indicating a headline-scale infrastructure commitment that could reshape revenue mix beyond BTC mining if officially confirmed. Source: WatcherGuru on X, Dec 17, 2025. The source post provides no details on lease location, term, capacity, financing structure, or revenue mechanics, limiting immediate valuation analysis. Source: WatcherGuru on X, Dec 17, 2025. The source post does not link to an official Hut 8 or Google press release or regulatory filing, so traders may monitor for company disclosures before repositioning around miner-to-AI infrastructure narratives. Source: WatcherGuru on X, Dec 17, 2025. |